Appendix B. CHECKLIST FOR CENSUS SURVEY OF BUILDING & CONTAINMENT ASSESSMENT FOR IMIS
Date: _ _/_ _/ _ _ _ _
Name of Surveyor:
Name of Respondent:
Gender (Male/Female/Others):
Contact number of Respondent:
Owner Information
- Name of Owner:
- Gender (Male/Female/Others):
- Contact number of Owner:
- Ward:
- House Address:
- Road Code (XXX):
- Road Name:
- Tax Code/ Holding ID:
Building Information
1.What is the construction type of the building?
-
- RCC
- Load bearing with cement mortar
- Load bearing with mud/lime mortar
- Wooden/Mud/CGI /Temporary
- teel structure
- Other (Specify):
- What is construction year of the building (YYYY AD)?
- Number of floor (including ground floor):
- Is the Building Low Income Household?
- Yes
- No
- If Q.12 is Yes, Low Income Community Name, if applicable?
- What is the use purpose of the building?
- Residential
- Commercial
- Mixed (Residential and Commercial)
- Offices
- Educational
- Hospital/clinic
- Industrial
- Assembly
- Other (Specify):
- What business /governmental institutions/offices/educational entities are present in the building? List out names.
- How many households (HHs) are living in the building?
- How many people are living in the building including all households?
- Male:
- Female:
- Others:
If differently abled:
- Male:
- Female:
- Others:
Toilet & Containment Information
-
Do you have a toilet on your premises?
- Yes
- No
-
If Q18 “No”, where do your family go for defecation?
- Use Community Toilet
- Open defecation at water bodies/ open ground
- Others (Specify):
-
If Q18 “Yes”, how many toilets do you have?
-
If Q18 “Yes”, how many households have shared toilets?
-
If Q18 “Yes”, Where does your toilet connection go?
- Sewer Network
- Drain Network
- Septic Tank
- Pit/ Holding Tank
- Onsite Treatment (e.g., Anaerobic Digestor/ Biogas, DEWATS)
- Composting Toilet (e.g., ecosan, UDDT, etc.)
- Water Body
- Open Ground ix. Shared Septic Tank
-
If Q22 “Septic tank”, where does your outlet connection go?
- Septic Tank connected to Sewer Network
- Septic Tank connected to Drain Network
- Septic Tank connected to Soak Pit
- Septic Tank connected to Water body
- Septic Tank connected to Open Ground
- Septic Tank without Outlet Connection
- Septic Tank with Unknown Outlet Connection
-
If Q22 “Holding Tank/ Pit”, what type of Pit is it?
- Double Pit
- Permeable/ Unlined Pit/Holding Tank
- Lined Pit
-
If Q24 “Lined Pit”, where does your outlet connection go?
-
Lined Pit connected to a Soak Pit
-
Lined Pit connected to Water Body
-
Lined Pit connected to Open Ground iv. Lined Pit connected to Sewer Network
-
Lined Pit connected to Drain Network
-
Lined Pit without Outlet
-
Lined Pit with Unknown Outlet Connection
-
If Q 22 “Sewer Network” or Q 23 ”Septic Tank connected to Sewer Network” or Q 25” Lined Pit connected to Sewer Network” then Sewer Code?
-
If Q 22 “Drain Network” or Q 23 ”Septic Tank connected to Drain Network” or Q 25” Lined Pit connected to Drain Network” then Drain Code?
-
-
If Q22 “Septic Tank”, does septic tank have at least 2 chambers, outlet at top, sealed/lined base, and walls?
- Yes
- No
- Don’t know
-
If Q22 “Septic Tank/ Pit/Holding Tank”, When was the containment constructed (YYYY AD)?
-
If Q22 “Septic Tank/ Pit/Holding Tank”, Where it is located?
- Inside the building footprint
- Outside the building footprint
- Don’t know
-
If Q22 “Septic Tank/ Pit/Holding Tank”, have you ever emptied your septic tank/holding tank/pit?
- Yes
- No
-
If Q29 “Yes”, when was it last emptied (year)?
-
If Q22 “Septic Tank/ Pit/Holding Tank”, what is the estimated size of your Septic Tank/ Pit/Holding Tank”?
-
If Q19 “Use Community Toilet”, then name of Community Toilet?
-
If Q22 “Shared Septic Tank”, BIN of building that has septic tank pre-connected?
Water Use Information
- What is the main source of water for drinking?
-
Municipal/Public Water Supply
-
Dug Well
-
Tube Well
-
Spring/River/Canal/Stone Spout
-
Rainwater
-
Private Tanker Water
-
Jar Water
-
Others
-
- If Q24, “Municipal/Public water supply”, what is your water supply customer ID?
- If Q24, “Municipal/Public water supply”, what is your water supply Pipe ID?
- Do you have well on your premises?
- Yes
- No
- If Q27, “Yes”, what is distance of well from the nearest septic tank/holding tank/pit?
Solid waste Information
- Do you have a solid waste collection service?
- If Q29 “Yes”, what is name of the solid waste service provider?
- If Q29 “Yes”, what is your solid waste customer ID
No Comments