1. Base map | Administrative boundary |
| Water bodies |
| Road/Rail network |
| Land-use |
| Building footprints |
| Building uses |
| Ward-wise population |
2. Waterlogged Risk mapping | Elevation profile |
| Natural drainage density |
| Storm water drainage network |
3. Flood risk mapping | Highest flood level (HFL) of nearby river |
| Elevation profile |
4. Water proximity settlements mapping | Buffer of water bodies |
5. Hard to reach settlement mapping | Applying buffers on different road width |
| In-accessible settlements |
| Building footprints |
6. LIC Settlements | Building structure types (Katcha and Pucca) |
7. Public Toilet – upgradation and new units | Location of all existing toilets |
8. FSTP Proximity Assessment Mapping | Building footprints |
| Road width and network |
| Location of FSTP |
9. Greywater management | Watershed maps |